Aplicaciones TecnolÃģgicas

Aplicaciones TecnolÃģgicas

flip_to_front SMART
GRIDS
Our company is dedicated to providing cutting-edge technological solutions across a range of specialised fields Our business lines SMART
EARTHING
flip_to_front SMART
OUTSOURCING
SCROLL DOWN
|

MEDICAL
TECHNOLOGY
flip_to_front Intelligent protection against lightning strikes Earthing 4.0 flip_to_front Connecting the energy future
Innovation at your fingertips Ionising radiation detection and protection
Advanced health solutions flip_to_front SMART
LIGHTNING
flip_to_front RADIATION
PROTECTION
PT FR EN ES CONTACT

Our distinction: technical strength

More than 30 years of experience in research and development and innovation.

Our own, experienced scientific-technical team, that covers the complexity of essential disciplines to guarantee the solvency and reliability of our products and services.

This is our model of growth: continuous innovation and commitment to the client.

Get to know us.

Do you want to
join our team?

We are looking for people with a positive and proactive attitude who, by joining our team, contribute to the development of our business growth plan with their knowledge, skills, hard work, perseverance and determined attitude.

SMART EARTHING – SMART LIGHTNING
News and updates

What is soil resistivity and why is a geoelectrical study necessary?

The geoelectrical study of the subsoil makes it possible to establish the optimum configuration of the earthing system to be designed. The ground resistivity measurement makes it possible to determine the layout, depth, number and type of elements necessary according to safety and functional requirements.

Calculation of the protected volume by Early Streamer Emission (ESE) Air Terminals: two valid ways with identical results

Lightning protection in buildings is crucial to avoid personal, material and economic damage. An Early Streamer Emission air terminal is a high-tech device that responds to the approach of a lightning strike, anticipating its capture of other elements within its protection zone, in order to conduct the discharge current safely to the earthing. To fulfil their functions, they must be installed after calculating their protection radius in such a way as to protect the desired elements, an operation that can be carried out using two different methods but with identical results: those proposed by the UNE21186 standard and by the Technical Building Code (CTE). However, an erroneous interpretation of the latter can be dangerous.

Contact



    I would like to speak with a expert.

    Receive the lastest news and product information from Aplicaciones TecnolÃģgicas.


    START TYPING AND PRESS ENTER TO SEARCH