How to install a lightning protection system using ESE air terminals

How to install a lightning protection system using ESE air terminals

Learn the basis of the ESE air terminals installation with this easy-to-use guide

 

Click here to follow step by step a typical early streamer emission air terminal installation, which consists of:

 

  1. Earthing installation, soil resistance measurement, 1st phase of Conductiver® Plus
  2. Placing the chemical fixings for the anchorage
  3. Mounting the lightning air terminal, adapting piece, mast and conductor
  4. 2nd phase of Conductiver® Plus
  5. Placing the anchorage and fixing the air terminal, piece and mast assembly
  6. Fixing the down-conductor clips
  7. Lightning event counter and guard tube installation
  8. Arranging the earth pits and bonding bars
  9. Earthing resistance final measurement